1-800-272-2689

              

Email: barry@windsorinc.net

For Enlarged Pictures Click on Thumbnails

 PROPER  DRILLING  FOR  HORIZONTAL TUBES
     To ensure proper draining

 
 

   
     
 
It is important to drill as close as possible to the vertical post ( within a 1/4" from connecting post ) to prevent pre-treat and rinse water from pocketing in the corners.


               

   

Detail "A"


[ Return to Last Page ]

KYNAR 500* - POWDER - KYNAR XL - PICTORIAL - ARCHITECT'S SPEC'S - METAL PREPARATION - WARRANTY'S - ABOUT US - HOME